Estimate, buy, build and hand over on one record per project. bdcpm tells you each morning which project is behind time or over cost, what is waiting for you, and what happened on every site.
The S-curve compares planned and actual progress and cost every month. Time (SPI) and cost (CPI) signals, the forecast final cost and finish date, and alerts 7 days before an activity and 15 days after it is late.
Approved requisitions become purchase orders, checked against the budget and the prices you paid before. Deliveries go to Material Stock and payments to the Cash Book by themselves.
Site photos carry the date, time and GPS position and show how far from the site they were taken. Daily Reports fill in the site's weather; monthly reports collect the progress and photos.
Initial budget, BoQ and estimates from the quantity survey; cash book, ledger, RA bills with retention, VAT and AIT; and a cash-flow forecast that warns before a site runs short.
Each client follows the project in a portal and approves drawings, budgets, site forms and variations, signed with their full name, date and time. Bills and monthly reports are there too.
Quality checks, NCRs, snags and safety logs are closed as the work goes on. The closing report lists warranties, test certificates, documents and any open snags.
Engineers and supervisors use bdcpm on their phones. With no signal, pages they opened before still open, and Daily Reports, site forms and photos are kept on the phone and sent by themselves when the signal returns.
Every step uses what the step before it made, so nobody types the same figure twice.
Every project's health, money and cash flow on one dashboard; approvals and escalations come to you.
Design stages with review and client sign-off; quantities, BBS and estimates that stay in sync.
Daily Report, photos, requisitions, stock, machinery and site forms from the phone.
Orders, deliveries, supplier payments, RA bills, cash book and company accounts with two-step approval.
30+ QS modules, material takeoff, PWD and BRAC rates, BoQ, Measurement Book and RA bills.
Their own portal: progress, approvals, variations, monthly reports and bills.
The RAJUK DAP 2022–2035 FAR calculator: permitted floor area, floors, setbacks, parking and a PDF report, plus a construction calculator, unit converter and AIT / VAT tools.
Each role sees only what it needs; clients see only their own project.
Who did what and when, on every project, register and approval.
All your data as Excel files in one ZIP, whenever you want.
HTTPS everywhere, separate logins for the team, clients and admin.
Project Architect and Associate Project Manager for the BRAC University campus and Project Manager for the National Stadium for the Bangladesh Cricket Board. He built bdcpm so that drawings, quantities, budgets, site progress and approvals are kept in one place, from the first requisition to the handover.
Yes. Register your company and use bdcpm free for 15 days, with no approval needed. Uploads and downloads open when you subscribe.
Yes. Every page works on a phone. Site photos get the date, time and GPS position printed on them, and Daily Reports, site forms and photos saved without a signal are sent by themselves when the signal returns.
Yes. Each client gets a portal for their own project: requisition and quotation, approvals of drawings, budgets and variations (signed with their name), monthly reports with photos, and bills.
Yes. The company admin can download all the company's data as Excel files in one ZIP at any time, with or without the photos and documents.
bdcpm works in English and Bangla; each person chooses the language at the top of the menu.
Yes. The RAJUK DAP 2022–2035 FAR calculator, the construction calculator, the unit converter and the AIT / VAT tools are free for everyone, with no sign-up.